New Hydro-Agricultural Infrastructure Launched in Torbeck, Haiti
On November 20, 2026, Haitian Minister of Agriculture Marcelin Aubourg initiated the construction and rehabilitation of irrigation systems in the Périgny and Charlette areas of Torbeck. This project is part of the Irrigation Support Project in the South (PAIS), which aims to enhance water access for over 500 hectares of farmland over the next 15 months.
During the launch, Minister Aubourg stated that these investments are designed to strengthen hydro-agricultural infrastructure sustainably, improve water resource management, and support agricultural growth in the region. He emphasized that the project aligns with Prime Minister Fils-Aimé’s vision of providing long-term solutions to the challenges posed by drought.
Aubourg reflected on a commitment he made while serving as the head of the Departmental Directorate of Agriculture for the South, noting that improving national production is crucial in the fight against food insecurity. He reiterated the importance of ensuring water access to bolster agricultural production and enhance food security throughout Haiti.
Details of PAIS Interventions in Torbeck:
The project involves two key components aimed at rehabilitating and modernizing the Périgny irrigation system, focusing on water sourcing, distribution, and management to support local agricultural activities.
Lot 1: This phase includes the construction and rehabilitation of water intake and regulation structures on the Torbeck River. Planned features encompass a new 50-meter-long reinforced concrete weir, an 11-meter-wide dissipation basin, a sluice with a valve, and an intake structure with two gated openings. The project also includes a 60-meter-long masonry desilting channel, a discharge structure with additional gated openings, and erosion control measures such as gabions along the right bank.
Lot 2: This component focuses on reconstructing and restoring the Périgny irrigation network. It includes rebuilding the dead-end section of the canal over 150 meters, renovating various segments of the main canal, and lining the upstream section. Additionally, the plan involves constructing raised weirs, lateral intakes, and communal facilities for livestock, enhancing the overall stability of the irrigation system.
Through these initiatives, the Ministry of Agriculture aims to improve irrigation conditions and promote efficient use of farmland in the Périgny plain, ultimately fostering enhanced agricultural productivity in the region.


